This article summarizes the verification studies of the reinforced concrete strengthening module and their results. The formulas were compared with an independent implementation and hand calculations, and their effects were followed through analysis results on sample reinforced concrete buildings (frame, shear wall and infill wall variants).

1. Results unchanged while strengthening is off​

tip

Even when strengthening data is defined, while the main option is off, the performance assessment results of all elements of the sample building were compared line by line with the results before the strengthening module was added, and zero difference was found. This comparison is repeated in every edition.

2. Annex 15B formulas and the FRP chain​

VerificationMethodResult
κa, εf, ρf, fl, fcc, εcc (continuous and strip wrapping, circular, ellipse, including aspect ratio exceedance; 7 cases)Comparison with an independent implementationLargest relative difference 3.3·10⁻¹³ %
Vf (continuous, strip, including the case where the strip spacing condition is not satisfied; 5 cases)Comparison with an independent implementation1.7·10⁻¹³ %
Vf in the analysis chainFRP applied to 12 columns and 17 beamsBeam shear contribution identical to the unit test value (281.0 kN)
Section effectFRP on the 12 columns of the 1st storeyOnly the results of these columns changed; curvature capacity +3.6% (expected effect of the Annex 15B idealization)
Lap-splice length (15B.9–15B.11)Hand calculationRequired FRP thickness and intermediate quantities identical; required thickness zero where the existing stirrup is sufficient

3. Column jacketing, steel and RC jacketing, external stirrups​

VerificationResult
Stiffness: 10 cm, 4-face jacket on the 12 columns of the 1st storeyFirst period 0.3252 → 0.2811 s; it returns exactly when the option is turned off
Capacity: same columnsYield moment ratio in the jacketed columns at most 1.34 (50×50 → 70×70 cm, with the 0.9 factor)
Jacket longitudinal reinforcement: 8Ø16Bar layout and areas identical to the hand calculation; column yield moment ratio (reinforced/unreinforced) averages 1.36; U, L and single-side layouts in 3-, 2- and 1-face jackets verified by hand
Jacket models (Composite, Code letter, Jacket only; 8 cases)Transformed section properties identical to the independent calculation with a relative difference ≤ 4·10⁻¹⁵; hand calculation checks consistent. Period and capacity ordering as expected
Jacket stirrupsShear contribution identical to the hand calculation (Ø10/100, 2 legs: 435.4 kN, with the 0.9 factor)
One-sided jacketIn the asymmetric section the ± capacities are calculated separately and the smaller is taken; in the 4-face jacket the results are identical to the symmetric case
Steel jacketing (Vj) and external stirrups (Vw)Calculated values identical to the formula; Vj identical to the value in the window summary
RC jacketingShear strength ×0.9; flexure and stiffness do not change

4. New strengthening shear wall​

In the sample building with shear walls, one shear wall was marked as a “new strengthening shear wall”:

RunPeriodsShear wall
Unmarked (ordinary shear wall)T1 = 0.3175 sOrdinary shear wall
Marked, option offT1 = 0.4087 sNot in the before-strengthening model
Marked, option onIdentical to the unmarked runAnchorage demand q = 332.4 N/mm, capacity qr = 367.2 N/mm, ratio 0.905
tip

It was verified through mass breakdowns that, while the option is off, the self-weight of the shear wall is removed from the storey weight, the building weight and the finite element masses, and that the slab load resting on the wall is distributed to the neighbouring supports with the total preserved. The anchorage values are identical to the hand calculation.

5. Infill wall strengthening (Annex 15C)​

In the shear wall building variant, one wall was converted into an infill wall (654 × 260 cm net, 24 cm thick, columns 50×50) and two methods were calculated:

RunProgramHand calculation
Steel-mesh reinforced plaster (30 mm, 2 faces)ad = 911.2 mm; kd = 77,678.6 kN/m; Vd = 1294.9 kNad = 911 mm; kd = 77.66 MN/m; Vd = min(1825; 1295) = 1295 kN
FRP diagonal stripad = 931.7 mm; kt = 1627.5 kN/m; Tf = 34.4 kN; Vd = 313.9 kNkt = 1627.5 kN/m; Tf = 34.4 kN; Vd = 313.9 kN
Steel-mesh reinforced plaster, option offResults identical to the building without strengthening—
info

In pushover analysis, the one-way strut setup was compared with a symmetric paired setup: same number of events and a base shear difference smaller than 0.01% (the total horizontal stiffness is the same; the difference is only in the distribution of strut forces). The events where the diagonal struts reached capacity were verified by hand calculation: the compression strut was removed from the model at N = Vd / cos θ, and the FRP tension tie at T = Tf.

In a test model prepared with inputs that do not satisfy the code conditions (small corner radius, thin wrapping, short lap splice, insufficient anchorage, thin plaster and high opening ratio), the expected error and warning lines dropped into the project check list without repetition.

6. Before / after comparison​

On the sample building, the analysis was first run with the option off (before), and then with jacketing applied to 12 columns and the option on (after). The comparison block correctly reported the building level, the criteria percentages, the 12 strengthened elements and the damage distribution. No difference in damage, failure mode or building level was found between running the two runs one after the other in the same session and running them separately.

7. Interface and saving​

  • The Strengthening tab in the three properties windows was checked for multiple selection, the activation of options according to element type, and the carry-over of values from a previous element.
  • The strengthening data was saved in both text and binary project formats and re-opened, and read back exactly the same. Old project files open without strengthening.
note

It is essential that all results produced by the software are checked by the responsible engineer.