Skip to main content

Obtaining the Geotechnical Preliminary Report

For geotechnical preliminary report information to be included in foundation reports, the foundations must be drawn in the project and a soil-structure interaction analysis must have been performed.

The checkbox marked in the image must be selected for the soil-structure interaction analysis.

Yapı temel etkileşim

When the analysis is run with foundation reports selected, you can view the required details for the geotechnical preliminary report on the foundation calculations report page.