Obtaining the Geotechnical Preliminary Report
For geotechnical preliminary report information to be included in foundation reports, the foundations must be drawn in the project and a soil-structure interaction analysis must have been performed.
The checkbox marked in the image must be selected for the soil-structure interaction analysis.
When the analysis is run with foundation reports selected, you can view the required details for the geotechnical preliminary report on the foundation calculations report page.